Operation
Turb 555 / Turb 555 IR
40
ba41113e07
04/2009
4 Insert the 0.02 NTU calibration standard into the cu-
vette shaft.
5 Align the cuvette.
6 Press the
1
key.
During the calibration step, the
c
and
s
sym-
bols flash. The lower display line shows the remain-
ing measuring cycles until the end of the calibration
step.
7 Wait until the calibration step is finished.
The instrument asks you to insert the next calibration
standard (1.75K = 1750 NTU).
8 Insert the 1750 NTU calibration standard into the cu-
vette shaft.
Содержание Turb 555
Страница 1: ...ba41113e07 04 2009 Turb 555 Turb 555 IR Operating Manual Turbidity measuring instrument...
Страница 12: ...Safety Turb 555 Turb 555IR 12 ba41113e07 04 2009...
Страница 16: ...Commissioning Turb 555 Turb 555IR 16 ba41113e07 04 2009...
Страница 62: ...Operation Turb 555 Turb 555IR 62 ba41113e07 04 2009...
Страница 66: ...Maintenance cleaning disposal Turb 555 Turb 555IR 66 ba41113e07 04 2009...
Страница 74: ...Technical data Turb 555 Turb 555IR 74 ba41113e07 04 2009...
Страница 81: ......