Design information
Notes:
Separate (8) on the slide coupling for inspection or separation.
Lubricate all air/flue gas joints prior to installation, e.g. with a soapy solution or coat lightly with sui
-
table grease.
During installation, slide the separator (8) fully into the coupling.
Push the next balanced flue pipe (4) 50 mm (dim. "S") into the
coupling of the separator, and secure in this location, e.g. with
pipe clips DN 125 (5) or a fixing screw on the air inlet side.
Install all horizontal flue pipes with
approx. 3° slope (6 cm/m) towards
the boiler. Any condensate must
be returned to the boiler.
Install the centring triangles near
the end of the pipe.
* Observe the installation instructions for the flue gas
system made from polypropylene (PP).
Secondary
ventilation
Secure the support bend (23)
on the support rail (22)
Determine clearance A. Balanced flue pipe length (4) always
approx. 100 mm longer than distance A. Always trim the flue
pipe on the smooth side, never on the coupling side.
Chamfer the flue pipe after trimming.
Clearance A
Clearance A
Offset
Flat:
Affix the ceiling outlet approx. Ø 130 mm (14) in
the roof cover.
Pitched:
At (11), observe the installation instructions on the
hood, regarding roof pitches.
Insert the roof outlet (13) from above through the roof and
secure vertically with (9) on a rafter or on the brickwork.
Install the roof outlet only in its original condition.
Modifications are not permissible.
If an inspection aperture is required for the balanced flue pipe,
insert a balanced flue pipe with inspection aperture (3)
(200 mm length).
Slacken and move (3) the clamp for inspections.
Slacken and remove the flue pipe cover.
Inspection piece (3)
Supplementary installation notes
12
13
6
14
7
650
550-1050
1250
1750-230
0
25
22
23
24
8
4
4
5
S
S
10
16
4/
15
16
220
>400
Bends
Offset
87°
min. 205 mm
45°
min. 93 mm
Clearance