Power supply
Terminal box
The control, regulating and safety equipment are fully
wired and tested.
The boiler is factory-fitted with a safety plug.
Mains electrical connection
The system is connected to the power supply system
by a safety plug.
If the system is connected to the power supply in the pro
-
ximity of a bath or a shower (protection areas 1 and 2),
replace the safety plug with a permanent connection.
Terminal box
Strain relief
F 3.15 A
Rast-5 plugs
General notes
The installation must be carried out by a
licensed electrical contractor. Observe
local regulations and those of the power
supply company.
The power supply terminals are 'live' even
when the ON/OFF switch has been swit
-
ched OFF.
Power supply
230 V AC/50 Hz
Power supply, ext. accessories
230 V AC/50 Hz/max. 300 VA
Programmable
output
230 V AC/50 Hz
Programma
-
ble input
zero volt
Outside
temp.
sensor
Data BUS
(controller, radio clock, AF with
radio clock, receiver, outside
radio sensor)
Installation information, power supply
- Isolate the system from the power supply before
opening the casing.
- Pivot the control unit to the side.
- Open the terminal box.
- Insert the strain relief into the holes provided.
- Strip approx. 70 mm off the power supply cable insu
-
lation.
- Push the cable through the strain relief and secure
the strain relief.
- Pull the Rast-5 plugs.
- Terminate the appropriate cores at the Rast-5
plugs.
- Push the inserts back into the terminal box casing.
- Push the Rast-5 plugs back into their correct posi
-
tions.