4
3061490_0709
Obtain the permission of your mains gas supplier
and flue gas inspector prior to the installation of Wolf
gas fired boilers [where appropriate].
Wolf gas fired boilers must only be installed by a re
-
cognised heating contractor. This heating contractor
will also be responsible for the proper installation and
commissioning of the heating system.
The following regulations, rules and guidelines must be
observed during installation:
- DIN EN 12828
Heating systems in buildings, designing hot water
heating systems
- VDE 0722 / EN50165
Electrical equipment of heat generators with non-
electrical heating systems.
- EN 60335-1
Safety of electrical equipment for domestic use and
similar purposes
- VDE 0470 / EN 60529
Protection through housings
Standards and regulations
Note: Please read these instructions carefully
before the installation and keep them in a
safe place. Please also note the technical
information in the appendix.
Any damage or loss resulting from technical
modifications to the control unit or to the
control components are excluded from our
liability.
Incorrect use can lead to a risk to life and
limb or to a risk of material losses.
Requirements
The installation of the boiler must be in accordance with
the relevant requirements of Gas Safety (Installation and
Use) Regulations 1998, Health and Safety Document
No. 635 (The Electricity at Work Regulations 1989), BS
7671 (IEE Wiring Regulations) and the Water Supply
(Water Fitting) Regulations 1999, or The Water Bylaws
2000 (Scotland). It should also be in accordance with
the relevant requirements of the Local Authority, Building
Regulations, including amendments to the Approved
Documents Part L and J 2002, The Building Regulations
(Scotland), The Building Regulations (Northern Ireland)
and the relevant recommendations of the following British
Standards:
BS 5440: Flues and ventilation of gas fired boilers not
exceeding 70 kW net:
- Part 1: Flues
- Part 2: Ventilation
BS 5449: Specification for forced circulation hot water
for domestic premises.
BS 5546: Specification for gas hot water supplies for
domestic premises.
BS 6700: Services supplying water for domestic use
within buildings and their curtilages.
BS 6798: Specification for installation of gas fired boilers
not exceeding 60 kW input.
BS 6891: Specification for installation of low pressure
gas pipework up to 28 mm (R1") in domestic
premises (2
nd
family gas).
BS 7593: Treatment of water in domestic hot water
central heating systems.
Institute of Gas Engineers Publication IGE/UP/7/1998:
"Guide for gas installations in timber framed housing".
Important: The appliance must be installed
and serviced by a competent person as
stated in the Gas Safety (Installation and Use)
Regulations 1998. In IE, the installation must
be in accordance with the current edition
of I.S,813 ´Domestic Gas Installations´, the
current Building Regulations and reference
should be made to the current ECI rules for
electrical installation.
When tightening or loosening threaded
connections always use suitable open-ended
spanners (not pipe wrench, or extensions,
etc.). Incorrect use and/or unsuitable tools
can lead to damage (e.g. gas or water
leaks)!
Содержание CGB-35
Страница 58: ...58 3061490_0709 Notes ...
Страница 59: ...59 3061490_0709 Notes ...