26
3061490_0709
Saving energy
- Instruct the customer about energy-saving options.
- Refer your customer to section "Information regarding
energy-efficient operation" in the operating instruc
-
tions.
The initial start-up and operation of the boi
-
ler as well as the user instruction must only
be carried out by a qualified contractor.
Fig.: Control unit overview
ON/OFF switch
Thermomanometer
Reset button
Illuminated ring
Commissioning
- Check that all flue accessories have been correctly
installed.
- Open the shut-off valves on the flow and return
pipes.
- Open the gas shut-off valve.
- Switch ON the system ON/OFF switch on the control
unit.
- Check the over-ignition and the regular flame structure
of the main burner.
- If the system pressure on the heating water side
(primary) drops below 1.5 bar, top up with water until
the pressure reached between 2.0 and a maximum
of 2.5 bar.
- The illuminated ring shows green, if the boiler starts
correctly.
- Check that the condensate drains correctly.
- Make the customer familiar with the boiler operation
whilst referring to the operating instructions.
- Complete the commissioning report and hand over
the instructions to the customer.
- Check the boiler and system for leaks.
Prevent water leaks.
- Check the location and seating of all
fitted parts.
- Check all connections and component
connections for leaks.
- Water damage may result if leaks are not
prevented.
NB