11
3061490_0709
Assembly
- Mark the holes to be drilled (Ø12 mm) for the moun
-
ting bracket, bearing minimum clearances in mind.
- Insert the rawl plugs and secure the mounting bracket
with the screws provided.
- Hang the boiler with the mounting brace into the
mounting bracket.
Mounting brace
Fig.: Mounting brace on the boiler
Fig.: Fixing holes for the mounting bracket
Min. 662 mm
Ceiling
Initially, determine the location for the installation of the
gas fired boiler.
In your deliberations, consider the flue gas outlet, the
lateral clearances towards walls and ceilings and any
existing connections for gas, central heating, DHW and
electrics.
Mounting the boiler with a mounting bra
-
cket
Opening the casing lid
L.h. rotating locking screw
R.h. rotating locking screw
Fig.: Open the rotating locking screws
We recommend you remove the casing lid during ins
-
tallation.
- Pivot the control unit lid down.
- Unlock the casing lid with the l.h. and r.h. rotating
locking screw.
- Release the lower part of the casing lid and unhook
at the top.
Note:
When replacing an existing TGB-40 or TGB-
60 boiler, fit the new mounting bracket 11 mm
lower.
During the boiler installation ensure that
the fixing components are sufficiently
strong to carry its weight. Also consider the
wall consistency, otherwise gas or water
may escape which would result in a risk
of explosions and flooding.
Содержание CGB-35
Страница 58: ...58 3061490_0709 Notes ...
Страница 59: ...59 3061490_0709 Notes ...