![Wolf CGB-2 Series Скачать руководство пользователя страница 84](http://html.mh-extra.com/html/wolf/cgb-2-series/cgb-2-series_installation-instructions-for-contractors_991733084.webp)
84
3064810_201804
37. Technical information, air/flue gas
routing
Maintain the following clearance between the internal duct wall and
the flue:
for round ducts:
3 cm
for square ducts:
2 cm
1 Gas condensing boiler
2 Adaptor DN60/100
to DN80/125
16 Pipe collar
22 Support rail
23 Support bend 87° DN80
24 Spacer
25 PP flue pipe DN80
26 Duct cover
with
UV resistant terminal
31 Balanced flue distributor
80/80 mm
32 Air inlet pipe Ø 125 mm
33 Bend 90° DN80
34 87° tee with
inspection port DN80
35 Flue pipe DN80
500 mm
1000 mm
2000 mm
Install eccentric balanced flue distributor 80/80 mm (31) for separate air supply/flue gas
routing downstream of connection adaptor DN80/125 (2) with a test connector.
When connecting a balanced flue certified acc. to Building Regulations, observe the
permit of the relevant body.
Install the horizontal flue pipe with a slope of approx. 3° (6 cm/m) towards the boiler.
Route the horizontal air supply with a 3° slope towards the outside – fit the air inlet with
a wind protector; permissible wind pressure at the air inlet 90 Pa. The burner will not
start if the wind pressure is higher.
Eccentric balanced flue
2
34
25
16
22
23
24
25
26
1
Secondary
ventilation
C53
2
31
33
34
32
25
16
16
16
22
23
25
26
1
Secondary
ventilation
C53
Содержание CGB-2 Series
Страница 104: ...104 3064810_201804 46 Notes ...
Страница 105: ...3064810_201804 105 46 Notes ...
Страница 106: ...106 3064810_201804 46 Notes ...