![Wolf CGB-2 Series Скачать руководство пользователя страница 55](http://html.mh-extra.com/html/wolf/cgb-2-series/cgb-2-series_installation-instructions-for-contractors_991733055.webp)
3064810_201804
55
Rotary joint threaded connection
Fig: Threaded connection of rotary joint
Filling the trap
Prior to opening the gas ball valve and acknowledging
the fault:
• Remove the trap.
• Fill the trap with water up to the mark.
• Refit the trap.
• Open the gas ball valve and acknowledge the fault.
• Switch ON the condensing boiler at the red ON/OFF
switch in the WOLF logo.
Note:
The condensate hose attached to the trap must not form
a loop or roll up, as this could lead to impaired operation.
Trap
Fig: Trap
25. Filling the heating system/trap
When installing an automatic vent, lock the
lower threaded connection of the rotary joint
underneath the combustion chamber floor.
• Check the system pressure again and top up with
water if required.
Note:
During continuous operation, the heating circuit is auto-
matically vented via the high efficiency pump.
Please
note
Содержание CGB-2 Series
Страница 104: ...104 3064810_201804 46 Notes ...
Страница 105: ...3064810_201804 105 46 Notes ...
Страница 106: ...106 3064810_201804 46 Notes ...