![Wolf CGB-2 Series Скачать руководство пользователя страница 77](http://html.mh-extra.com/html/wolf/cgb-2-series/cgb-2-series_installation-instructions-for-contractors_991733077.webp)
3064810_201804
77
37. Technical information, air/flue gas
routing
4
4
17
11
12
13
14
16
3
9
15
1
2
8
9
4
8
10
3
4
3
5
4
5
3
5
4
1
1
1
Vertical balanced flue routing (examples) system DN 60/100
Flue gas < 120 °C
C93x
6
7
Install horizontal
pipe with > 3°
slop=e towards
boiler
Please
note
1 Gas condensing boiler
2 Balanced flue pipe with
inspection port
(250 mm long)
3 Separator DN60/100
(slide coupling)
if required
4 Balanced flue pipe DN60/100
500 mm
1000 mm
2000 mm
5 Balanced flue, vertical
DN60/100
(roof outlet for flat or pitched roofs)
L = 1200 mm
L = 1200 mm ... 1700 mm
6 Universal tile for
pitched roof 25/45°
7 Flat roof collar
8 Bend 45° DN60/100
9 Inspection bend DN60/100
10 Bend 87° DN60/100
11 Pipe collar
12 Support rail
13 Support bend 87° DN60 to DN80
14 Spacer
15 Flue pipe DN80
500 mm
1000 mm
2000 mm
16 Duct cover
with
UV resistant terminal
17 Spacer bracket
Installation examples for balanced flue con
-
nections (vertical)
C33x
C33x
C33x
Содержание CGB-2 Series
Страница 104: ...104 3064810_201804 46 Notes ...
Страница 105: ...3064810_201804 105 46 Notes ...
Страница 106: ...106 3064810_201804 46 Notes ...