![Wolf CGB-2 Series Скачать руководство пользователя страница 69](http://html.mh-extra.com/html/wolf/cgb-2-series/cgb-2-series_installation-instructions-for-contractors_991733069.webp)
3064810_201804
69
35. Commissioning report
Commissioning steps
Test values or confirmation
12.) Standard setting set on control unit?
□
13.) Required heating output set in contractor parameter HG04?
□
14.) Gas type set in contractor parameter HG12?
Natural gas
□
LPG
□
15.) Check system configuration and modify if required
Contractor parameter HG40
□
16.) Flue length compensation set according to "Flue length
compensation table" in contractor parameter HG45?
□
17.) Gas type and heating output entered on label?
□
18.) Balanced flue system checked?
□
19.) Flue gas emissions test (emissions test mode):
Gross flue gas temperature
Intake air temperature
Net flue gas temperature
Carbon dioxide content (CO
2
) or oxygen content (O
2
)
Carbon monoxide content (CO)
_____________ t
A
[°C]
_____________ t
A
[°C]
_____________ (t
A
- t
L
) [°C]
_____________ %
_____________ ppm
20.) Casing fitted?
□
21.) Function test carried out?
□
22.) System user instructed, documentation handed over?
□
23.) Commissioning confirmed?
_____________
□
Содержание CGB-2 Series
Страница 104: ...104 3064810_201804 46 Notes ...
Страница 105: ...3064810_201804 105 46 Notes ...
Страница 106: ...106 3064810_201804 46 Notes ...