Translation of the original operation manual
41
Airless 270_BAoDB_en_1405 • 0550022 • jw
Maintenance
After completing the maintenance and repair work, check the
function of all safety features and the correct functioning of the
equipment.
6.1
Regular inspections
The has to be examined and serviced by an expert regularly:
³
before initial commissioning,
³
after the modification or repair of parts of the system, which
could affect safety,
³
after work breaks longer than 6 months,
³
but at least every 12 months.
For decommissioned equipments, the inspection can be postponed
until the next commissioning.
The inspection results must be recorded in writing and kept until
the next inspection. The inspection report or a copy of it must be
available at the place of use of the equipment.
6.2
Maintenance plan
The information in the maintenance plan are recommendations.
The intervals may vary depending on the condition of materials
used and outer influences.
Interval
Activity
Reference
before each
commissioning
check level of release agent on the
high pressure pump, top up release
agent if required
see chapter 6.4.2
on page 44
once per week
check and clean the water separator
see chapter 6.3.1
on page 43
visual inspection of the compressed
air and material hoses
every 50 oper.
hrs
check release agent of the high
pressure pump for material residue
see chapter 6.4.3
on page 44
every three
years
inspection of the compressed air
and material hoses by an expert and
replacement if necessary
oper. hrs. = operating hours