Installation- and assembly instruction
5.1 Safety Instructions
The installation of machines and parts of machines must be done by technical skilled and qualified
staff, which obeys the safety instructions, valid and stated in this operation manual.
Consider
9.3 Tightening torques
5.2 Check before assembly and installation
Before starting with assembly works, immediately after receipt of goods, check serial number and pump type of name plate
with the information in order confirmation and delivery note. Moreover a sight check in regard to transport damages must
be done. The manufacturer must be notified immediately about transport damages, to assess whether the product is fully
operational or not.
Make sure, that no packing material is in voids of the pump/aggregate.
3.2.2 Unpacking
5.3 Installation- and assembly instruction
The installation of machines and parts of machines must be done by technical skilled and
qualified staff, which obeys the safety instructions, valid and stated in this operation manual.
Hazards for persons and property by installation of machines on unfixed or not load-bearing
fundaments.
Installation of product only on horizontal and plane surfaces
Consider weight data at product
1.
Installation of the machine at adjustment elements/fundament and align by means of a water level at shaft
and outlet. Allowable tolerance: 2 mm/m
2.
Use underlayment-sheets for a possibly necessary height adjustment. These must be put under between
the support surfaces of the product and the fundament near of the fastening screws. All used sheets must
lay plane! If adjustment elements are used, the alignment must be made by means of screwed feet.
3.
Screw in fastening screws and fasten it.
9.3 Tightening torques