2.3 Filling the integral hopper
The integral fuel hopper is filled by the fully automatic pellet feed. A Windhager representative or partner will
fill the hopper for the first time during start-up, and will start the boiler and familiarize the customer with the
operation and cleaning of the boiler, with the operating manual used for reference.
2.2 Check before commissioning
CAUTION
1) System pressure (heating water pressure)
The system must be filled and vented. When the system is cold, pressure should
be at minimum 14.5 psi / 1.0 bar, and at maximum 26 psi / 1.8 bar). If you have any
questions, your installer will gladly answer them.
CAUTION
2) Ventilation
Ensure the boiler/heater room is well ventilated. The air supply must be as free of
dust as possible.
CAUTION
3) Flue
Have your chimney expert check the flue, and if necessary, clean it.
5) Thermal discharge safeguard
Discharge funnel check. Outflow must not drip.
CAUTION
4) Barriers
Check that the barriers installed in the heating system have been opened.