PAGE 23 OF 102
INFLEXION PLUS
OPERATING INSTRUCTIONS
TP-5211901-C
JUNE 2021
Base Board:
The PC Board (PCB) contains the system logical controller and provides landing
points for customer power supply and vehicle interlock cables. The PCB also distributes DC (and
optional AC) power to components in the system.
Figure 3-10 Base Board (P/N: 4311701)
Wiring/Air Access Panel:
The wiring/air access panel provides interface points to attach supply
air and power/data cables. The wiring/air access panel is standard on models 3.0, 4.5, 6.0, and
7.5.
Access Holes:
The access holes on the left side of the base provide holes for the required
cables. These cables are for payload power, base power, and control lines for the system.
Access holes are standard on models 1.8 and 2.3.
90° Limit Switch:
This limit switch activates when the mast reaches the 90° vertical position.
The mast is driven into a rubber pad under the mast. It is activated by a magnet located on the tilt
mechanism. The remote control functions are disabled until this 90° limit switch is activated.
Once activated, the remote control functions are active for use. The limit switch is adjustable and
set at the factory. See Section 7.8.2 for optional adjustment procedure.
Stowed Limit Switch:
This limit switch activates when the mast reaches the horizontal stowed
position. After this switch activates, the controller drives the mast into the saddle until a specified
current limit is achieved for 0.5 seconds. This drives the mast into the saddle ensuring a tight fit
for vehicle transport. The stowed limit switch is activated by a magnet located on the tilt
mechanism. The switch location is adjustable and is factory set for a horizontal mounting surface.
If the vehicle surface is not flat, this switch may need to be adjusted for proper stowing of the
mast. See Section 7.8.3 for optional adjustment procedure.
Содержание Inflexion Plus 1.8
Страница 2: ......
Страница 6: ...PAGE 4 OF 102 INFLEXION PLUS OPERATING INSTRUCTIONS TP 5211901 C JUNE 2021 ...
Страница 16: ...PAGE 14 OF 102 INFLEXION PLUS OPERATING INSTRUCTIONS TP 5211901 C JUNE 2021 ...
Страница 30: ...PAGE 28 OF 102 INFLEXION PLUS OPERATING INSTRUCTIONS TP 5211901 C JUNE 2021 ...
Страница 50: ...PAGE 48 OF 102 INFLEXION PLUS OPERATING INSTRUCTIONS TP 5211901 C JUNE 2021 ...
Страница 62: ...PAGE 60 OF 102 INFLEXION PLUS OPERATING INSTRUCTIONS TP 5211901 C JUNE 2021 ...
Страница 80: ...PAGE 78 OF 102 INFLEXION PLUS OPERATING INSTRUCTIONS TP 5211901 C JUNE 2021 ...
Страница 81: ...PAGE 79 OF 102 INFLEXION PLUS OPERATING INSTRUCTIONS TP 5211901 C JUNE 2021 ...
Страница 82: ...PAGE 80 OF 102 INFLEXION PLUS OPERATING INSTRUCTIONS TP 5211901 C JUNE 2021 ...
Страница 94: ...PAGE 92 OF 102 INFLEXION PLUS OPERATING INSTRUCTIONS TP 5211901 C JUNE 2021 ...
Страница 96: ...PAGE 94 OF 102 INFLEXION PLUS OPERATING INSTRUCTIONS TP 5211901 C JUNE 2021 ...
Страница 100: ...PAGE 98 OF 102 INFLEXION PLUS OPERATING INSTRUCTIONS TP 5211901 C JUNE 2021 ...
Страница 102: ...PAGE 100 OF 102 INFLEXION PLUS OPERATING INSTRUCTIONS TP 5211901 C JUNE 2021 11 2 2 PositionIt PI 35 ...