2
2.. E
Elle
ec
cttrro
offo
orrm
miin
ng
g c
co
op
piin
ng
gs
s ffo
orr c
crro
ow
wn
ns
s
Measure out the gold electrolyte and brightener addi-
tive using the appropriate measuring beaker and pour
into the required beaker, inserting any reduction rings
required into the hotplate cover. Then place the beaker
onto the hotplate.
The gold electrolyte can only ever be used for a single
deposition. Ensure, therefore, that you measure out the
gold electrolyte as accurately as possible (± 2 ml). This
is the only way to ensure effective electroforming and
to obtain the maximum benefit from the gold electro-
lyte.
Please heed the shelf life of the gold electrolyte, as
well as any storage instructions.
Note that the gold electrolyte can stain clothes and
equipment – please take suitable precautions when
handling!
Assembly
Assemble electroforming head, distance piece and sili-
cone seal. Pull the copper rods through the appropriate
holes (the outer six holes for the large beaker, the
middle four holes for the medium-sized beaker and the
inner two openings for the small beaker) and arrange
the parts as indicated by the arrow.
Note:
!
11
calculated capacity
< 550 ml
• 2 - 6 parts
• 600 ml beaker (minimum quantity 200 ml)
• large magnetic agitator rod
english
Содержание AGC Micro
Страница 2: ...1 9 10 11 12 13 17 18 10 20 2 3 4 5 6 7 8 14 15 16...
Страница 28: ...28 1 10 0 K Ko on nf fo or rm mi it t t ts se er rk kl l r ru un ng g...
Страница 29: ...29 N No ot ti iz ze en n deutsch...
Страница 56: ...28 N No ot te es s...
Страница 57: ...29 N No ot te es s english...
Страница 84: ...28 N No ot te es s...
Страница 85: ...29 N No ot te es s fran ais...
Страница 112: ...28 N No ot ta a...