Figure 1
TOP PANEL
6.
Remove the knockout(s) that you will be using to route
the line set, power wires, display cable, bottle
probe, and drain line. For ease of installation, see Figure 2 for recommended orientation (with attic access).
Figure 2
ELECTRICAL
ACCESS
PANEL
INSTALLING THE EVAPORATOR
5.
Unscrew the twenty-two (22) screws and remove the
top and electrical access panels.
7. Using copper tubing per line set sizing chart, route the liquid
and suction lines to the tubing coming from the unit
8. Connect the line set to system using the line set connection
instructions
9. Insulate the suction line using Armaflex or similar insulation.
10.Route the drain line out of the primary evaporator unit with the
line set. Connect using the supplied 1/4” barb coupling.
11.Connect hard line drain tubing to provided flex tubing
12.Route the power wire, bottle probe, and display cable through
the knockouts in the electrical panel as shown
LINE
SET
MOUNTING
BRACKET
DRAIN
LINE
BOTTLE PROBE &
DISPLAY CABLE
KNOCKOUT
POWER &
THERMOSTAT WIRE
KNOCKOUT
NOTE:
The units come in
black. The mounting brackets
and front grilles are paintable,
enabling you to match your
desired color.
Page 14
08/04/21
Содержание Twin Ceiling Mount H.E. CM12000
Страница 29: ...CEILING MOUNT WIRING DIAGRAM KDT Page 27 08 04 21...
Страница 30: ...CEILING MOUNT WIRING DIAGRAM 24V Page 28 08 04 21...
Страница 31: ...CONDENSING UNIT WIRING DIAGRAM Page 29 08 04 21...
Страница 61: ...WhisperKOOL 1738 E Alpine Ave Stockton CA 95205 1 800 343 9463 www whisperkool com...