RECEIVING & INSPECTING THE SYSTEM
•
Use caution when lifting and check package for damage.
•
Lift only at the designated hand-hold locations on the shipping container, or fully support the container from
underneath. A shipment may include one or more boxes containing accessories.
•
Before opening the container, inspect the packaging for any obvious signs of damage or mishandling.
•
Write any discrepancy or visual damage on the bill of lading before signing.
•
Allow the condensing unit to sit for 24 hours prior to startup. The condensing unit can be placed in the
installation location, piped and evacuated during this time.
Note:
WhisperKOOL units are manufactured in the USA and tested prior to shipment.
•
Review the packing slip to verify contents.
•
Check the model number to ensure it is correct.
•
Check that all factory options ordered are listed.
If any items listed on the packing slip do not match your order information,
contact WhisperKOOL Customer Service immediately.
Check all shipped boxes for the following contents:
Please leave the system in its original box until you are ready for installation. This will allow you to move the product safely
without damaging it. When you are ready to remove the product from the box, refer to the installation instructions.
TIP:
Save your box and all packaging materials. They provide the only safe means of transporting/shipping the system.
Evaporator Unit Box 1
Condensing Unit Box
(1)
Primary
evaporator unit
Evaporator installation hardware bag (
primary
)
:
•
(12) 21/2” Phillips wood screws
•
(12) #8 3/8” Phillips pan-head screws
•
(1) Bypass plug
•
(1) 1/4” barbed coupling
•
(2) 3” strips of cork tape
Documentation bag (
primary
)
:
•
Ceiling Mount Twin owner’s manual
•
H.E.
R-134a split system warranty checklist
(1) Ceiling Mount condensing unit
KDT Plus hardware bag
:
•
(1) 11/16” OD grommet
•
(2) 1/2” nylon hole plugs
•
(4) #6 x 1” Phillips zinc Type A screws
•
(4) 8-10 x 7/8” blue plastic screw anchors
Accessory kit bag (
primary
)
:
•
Stainless steel probe (50 feet)
•
KDT Plus display cable (50 feet)
•
KDT Plus wall mount bracket assembly
•
KDT Plus flush mount bracket assembly
•
KDT Plus display assembly
•
Flush mount template
•
Evaporator installation hardware bag
•
KDT Plus hardware bag
Insulation blanket bag (
primary
)
:
•
(1) Ceiling Mount insulation blanket
Evaporator Unit Box 2
(1) S
econdary
evaporator unit
Evaporator installation hardware bag (s
econdary
)
Insulation blanket bag (s
econdary
)
:
•
(1) Ceiling Mount insulation blanket
Evaporator installation hardware bag (s
econdary
)
:
•
(12) 21/2” Phillips wood screws
•
(12) #8 3/8” Phillips pan-head screws
•
(1) Bypass plug
•
(1) 1/4” barbed coupling
•
(2) 3” strips of cork tape
Page 6
08/04/21
Содержание Twin Ceiling Mount H.E. CM12000
Страница 29: ...CEILING MOUNT WIRING DIAGRAM KDT Page 27 08 04 21...
Страница 30: ...CEILING MOUNT WIRING DIAGRAM 24V Page 28 08 04 21...
Страница 31: ...CONDENSING UNIT WIRING DIAGRAM Page 29 08 04 21...
Страница 61: ...WhisperKOOL 1738 E Alpine Ave Stockton CA 95205 1 800 343 9463 www whisperkool com...