INSULATION BLANKET INSTALLATION, CONTINUED
8. Set piece (B) in place by pressing firmly on all surfaces of the insulation that come in contact with the top of each
evaporator unit (see illustration).
9. Using a utility knife, cut holes in the insulation for line set, wiring, and drain line if needed.
10. Once insulation is installed, apply foil tape to all seams, covering them completely.
11. Inspect insulation for damage/defects. If damaged, repair with foil tape.
12. Apply cork tape or equivalent to areas where the line set, wiring, and drain line enter the unit.
If needed, trim excess insulation around all edges.
A
__ Min. Tack Time
Adhesive
__ Min. Cure Time
Directions
__ M
in. T
ack
Tim
e
Dire
ctio
ns
B
A
B
A
7. Spray the top of each evaporator unit with spray adhesive. (See spray adhesive directions for proper tack time
before proceeding to step 8.)
Page 17
08/04/21
Содержание Twin Ceiling Mount H.E. CM12000
Страница 29: ...CEILING MOUNT WIRING DIAGRAM KDT Page 27 08 04 21...
Страница 30: ...CEILING MOUNT WIRING DIAGRAM 24V Page 28 08 04 21...
Страница 31: ...CONDENSING UNIT WIRING DIAGRAM Page 29 08 04 21...
Страница 61: ...WhisperKOOL 1738 E Alpine Ave Stockton CA 95205 1 800 343 9463 www whisperkool com...