1.
Locate the desired installation location. Using a stud finder, locate the ceiling joists
on either side of the center point. Cut and frame 14.5” x 36” openings in the ceiling
for each evaporator unit. Make sure the framing is sufficient to support the weight of
the cooling unit. Use only the mounting locations provided. These locations ensure
that the installer will not drill into any critical components within the system.
2.
Determine which orientation the evaporator units will be installed in (inside the
cellar or with attic access). Mounting options are listed below:
Minimum Tools Needed:
Fully exposed mounting option
Flush mount option
Choose a mounting
option suitable
for the installation
location.
Partially recessed mounting option
Hammer
Saw
#2 Phillips-head screwdriver
SELECTING MOUNTING OPTIONS
T-square
1
2
3
4
12.65”
12.65”
5.75”
6.9”
6.9”
5.75”
Page 12
08/04/21
Содержание Twin Ceiling Mount H.E. CM12000
Страница 29: ...CEILING MOUNT WIRING DIAGRAM KDT Page 27 08 04 21...
Страница 30: ...CEILING MOUNT WIRING DIAGRAM 24V Page 28 08 04 21...
Страница 31: ...CONDENSING UNIT WIRING DIAGRAM Page 29 08 04 21...
Страница 61: ...WhisperKOOL 1738 E Alpine Ave Stockton CA 95205 1 800 343 9463 www whisperkool com...