Part number 550-100-168/0516
34
Determine location for vertical termination
1. Locate the vent termination using the following guidelines:
2. The vent piping must terminate in a coupling as shown in Figure 25,
page 35.
3. Consider the surroundings when terminating the vent:
a. Position the vent termination where vapors will not damage nearby
shrubs, plants or air conditioning equipment or be objectionable.
b. The flue products will form a noticeable plume as they condense in
cold air. Avoid areas where the plume could obstruct window views.
c. Prevailing winds could cause freezing of condensate and water/ice
buildup where flue products impinge on building surfaces or plants.
d. Avoid possibility of accidental contact of flue products with people
or pets.
e. Do not locate the termination where wind eddies could affect per-
formance or cause recirculation, such as inside building corners,
near adjacent buildings or surfaces, window wells, stairwells, alcoves,
courtyards or other recessed areas.
f. Locate or guard vent to prevent condensate damage to exterior
finishes.
&IGURE
DIRECT EXHAUST vertical termination
DIRECT EXHAUST — Vertical
termination — installation
sequence
3TAINLESSSTEELPIPE
— Install required
adapter at each boiler fitting where stain-
less steel pipe will be connected.
3TEP
Install the boiler.
3TEP
Determine the proper location for wall
penetration for each termination.
s
Prepare roof penetrations before
installing vent piping.
s
Finish by attaching external pipe and
fittings as shown in the termination
instructions.
s
Install terminations as described in
this manual.
s
Support vertical runs on the outside
of the building with brackets as
shown in the termination instruc-
tions.
3TEP
Install vent piping from boiler to termi-
nation.
s
Install a hanger support within
6 inches of any upturn in the piping.
s
Slope horizontal piping downward
toward the boiler at least 1/4 inch
per foot.
3TEP
Connect the vent piping at the boiler
per manual instructions.
Allowable vent pipe materials
1. Use only the materials listed in Figure 13, page 23.
2. Install a bird screen in each vent termination (coupling or elbow).
Bird screens are supplied with the boiler. Cut to size if necessary to fit
vent pipe size used.
Maximum piping length
1. Locate the terminations such that the total vent piping from the boiler to
the termination will not exceed the maximum length given in Figure 24.
2. Maximum lengths listed in Figure 24 allow for 2 elbows. Additional
elbows require a reduction in maximum length as explained in the
table notes.
Connecting from termination to boiler
1. Install the termination as instructed in the following. Then proceed
to page 45 to complete the vent piping between the termination and
the boiler.
&IGURE
Maximum piping lengths for DIRECT EXHAUST vertical
termination
"OILER
-!8)-5-PIPINGLENGTHFORPIPEDIAMETER
INCH
INCH
INCH
PP, PVC, CPVC, ABS, AL29-4C SS
Feet
Elbows **
Feet
Elbows **
Feet
Elbows **
SF-550
30
2
100
2
Not allowed
SF-750
Not allowed
30
2
100
2
*
For 4-inch or 6-inch piping, install a pipe reducer directly at the boiler connection,
oriented vertically. Install reducer above the required adapter if using stainless steel
piping.
**
For piping using more than 2 elbows, reduce maximum allowable length by 7 feet for
each additional elbow (90° or 45°).
SlimFit
®
Series 3
COMMERCIAL
CONDENSING
GAS
-
FIRED
WATER
BOILER
—
Boiler Manual
DIRECT EXHAUST — Vertical
Содержание 550 MBH
Страница 126: ...Part number 550 100 168 0516 126 SlimFit Series 3 COMMERCIAL CONDENSING GAS FIRED WATER BOILER Boiler Manual Notes ...
Страница 127: ...Part number 550 100 168 0516 127 SlimFit Series 3 COMMERCIAL CONDENSING GAS FIRED WATER BOILER Boiler Manual Notes ...
Страница 128: ...GAS FIRED WATER BOILER Boiler Manual SlimFit Series 3 COMMERCIAL CONDENSING GAS FIRED WATER BOILER Boiler Manual ...