Part number 550-100-168/0516
33
Termination and fittings
1. Prepare the vent termination elbow (Figure 18, page 32)
by inserting a bird screen. Bird screens are supplied
with the boiler, and may have to be trimmed to size for
smaller vents.
2. You can install the vent termination using either of the
configurations shown in Figure 18, page 32.
3. Maintain the required dimensions of the finished termi-
nation piping as shown in Figure 18, page 32.
4. Do not extend exposed vent pipe outside of the building
more than shown in this document. Condensate could
freeze and block vent pipe.
&IGURE
DIRECT EXHAUST — Sidewall —
termination assembly — all parts by
installer
1 Vent
piping
2 Cover
plates
3 Galvanized
thimble
4 Vent
elbow
5 Bird
screen
s
No closer than 48 inches below or horizontally from any
door or window or any other gravity air inlet.
b. Do not terminate closer than 4 feet horizontally from any elec-
tric meter, gas meter, regulator, relief valve or other equipment.
4. Because the SF-550 and SF-750 are Category IV appliances, the Na-
tional Fuel Gas Code, ANSI Z223.1, requires that the vent must not
terminate over a public walkway or over an area where condensate
or vapor could create a nuisance or hazard, or could be detrimental
to the operation of regulators, relief valves, or other equipment.
5. Where the vent penetrates an outside wall, the annular space
around the penetration must be permanently sealed using ap-
proved materials to prevent entry of combustion products into
the building.
6. Locate termination so it is not likely to be damaged by foreign
objects, such as stones or balls, or subject to buildup of leaves or
sediment.
7. Do not connect any other appliance to the vent pipe. Do not con-
nect multiple boilers to a common vent pipe.
Completing the vent piping
1. Install vent penetrations as explained in the following pages before
installing vent piping from the boiler to the terminations.
2. Insert piping from boiler vent connections, then attach exterior
termination piping.
3. Follow instructions beginning on page 45 to complete piping from
boiler to termination.
Multiple vent terminations
1. When terminating multiple direct exhaust SlimFit boilers, termi-
nate each vent connection as described in this manual for individual
vents. Space terminations as required for best installation practices
and required maintenance.
Prepare wall penetrations
1. Vent pipe penetration:
a. Cut a hole for the vent pipe. For either combustible or non-
combustible construction, size the vent pipe hole at least 0.4”
larger than the vent pipe diameter:
s
7” hole for 6” PP and PVC
s
9” hole for 8” PP and PVC
b. Insert a galvanized metal thimble in the vent pipe hole as
shown in Figure 35.
2. Use metal cover plates at wall penetrations.
3. Follow all local codes for isolation of vent pipe when passing
through floors or walls.
4. Seal exterior openings thoroughly with exterior caulk.
SlimFit
®
Series 3
COMMERCIAL
CONDENSING
GAS
-
FIRED
WATER
BOILER
—
Boiler Manual
DIRECT EXHAUST — Sidewall
(continued)
Содержание 550 MBH
Страница 126: ...Part number 550 100 168 0516 126 SlimFit Series 3 COMMERCIAL CONDENSING GAS FIRED WATER BOILER Boiler Manual Notes ...
Страница 127: ...Part number 550 100 168 0516 127 SlimFit Series 3 COMMERCIAL CONDENSING GAS FIRED WATER BOILER Boiler Manual Notes ...
Страница 128: ...GAS FIRED WATER BOILER Boiler Manual SlimFit Series 3 COMMERCIAL CONDENSING GAS FIRED WATER BOILER Boiler Manual ...