Pump and Fluid Systems
Chapter 2: Storage & Installation
weatherford.com
13
MP-16 2-Piece 5000 psi January 2013
2.1.6
Power End Preparation
The pump power end should arrive assembled and tested, but without expendables or
lubrication. Before operating the pump, check the following.
Lubrication
Check the oil reservoir for the possible accumulation of condensation, and drain and flush
by removing the pipe plugs on either side. Fill the power end with lubricant to the proper level
with a clean EP gear oil of the proper viscosity (see 4.3: Lubrication on page 29). Make sure
the oil is poured into the crosshead reservoir and worked into all of the bearings.
Recheck oil level after first 15 minutes of operation, and add more as needed.
Extension Rod and Diaphragm Stuffing Box Seals
Ensure the extension rod and diaphragm stuffing box seals are properly installed as per
5.3.7: Installing the Crossheads & Crosshead Guides.
2.1.7
Auxiliary or Ancillary Systems
Any Auxiliary or Ancillary systems, such as liner wash systems and jib cranes, should be
installed in accordance with the manufacturer’s guidelines. If those come into conflict with the
regulations here, default to the manufacturer’s specifications, unless those come into direct
conflict with the safety and operational guidelines outlined here. When in doubt, contact a
Weatherford professional or manufacturer agent for information regarding the systems used.