Pump and Fluid Systems
Chapter 2: Storage & Installation
weatherford.com
18
MP-16 2-Piece 5000 psi January 2013
Chapter 3: Operations
This section covers all standard procedures used to operate the MP-16 triplex pump. It
includes all basic operational guidelines and recommendations, as well as pump startup and
shutdown procedures.
3.1
Starting Procedure
The following startup procedure will help to ensure that the pump operates at maximum
efficiency and will reduce the potential for damage during start-up.
3.1.1
Initial Startup
While all Weatherford pumps are shipped with the factory run tests complete, they should
always be inspected before beginning startup procedures. Check that all components are
correctly positioned and secured, and are not damaged or corroded. Drain and flush as
necessary to remove any condensation that may have formed during shipment or storage.
CAUTION
New pumps should always receive a full inspection to make sure it has
not suffered damage and that all parts are properly set in place. Failure
to do so can result in serious equipment damage and injury to
personnel upon startup.
Once the inspection is complete, fill the power end with new, high-quality oil to the
recommended level. Then disconnect the drive system, and use the pinion rotation tool to
rotate the pump by hand for several complete revolutions to ensure there are no unusual
knocks, vibrations or tight spots. If the pump does not rotate smoothly, investigate the source
of the problem and correct before attempting to operate the pump.