![Waters SYNAPT G2 Скачать руководство пользователя страница 217](http://html1.mh-extra.com/html/waters/synapt-g2/synapt-g2_operators-overview-and-maintenance-manual_3698349217.webp)
Connecting the liquid waste line
B-13
Connecting the liquid waste line
Required materials
•
Chemical-resistant, powder-free gloves
•
Waste container
To connect the liquid waste line
1. Place a suitable waste container below the mass spectrometer.
2. Slide a drain line over the barbed fitting of the drain (located at the
left-hand side of the mass spectrometer).
Warning:
The waste line and connection can be contaminated with
biologically hazardous materials. Always wear chemical-resistant,
powder-free gloves while performing this procedure.
Drain line
Содержание SYNAPT G2
Страница 18: ...xviii Table of Contents...
Страница 46: ...2 8 Starting Up and Shutting Down the Mass Spectrometer...
Страница 66: ...3 20 Configuring the LockSpray Source...
Страница 228: ...B 24 External Connections 7 Click Next Result The software installs 8 Click Finish...
Страница 232: ...C 4 Materials of construction and compliant solvents...