![Waters SYNAPT G2 Скачать руководство пользователя страница 120](http://html1.mh-extra.com/html/waters/synapt-g2/synapt-g2_operators-overview-and-maintenance-manual_3698349120.webp)
5-42
Maintenance Procedures
12. Holding the PEEK terminal block gently, use the needle-nose pliers to
gently grasp the heat-shrink tubing on the heater cartridge assembly
and carefully slide it and the PEEK terminal block out of the ion block.
13. Using the O-ring removal kit, carefully remove the cover seal from the
ion block (see
).
Heat-shrink tubing
Heater cartridge assembly
PEEK terminal block
Cover seal
Cone gas O-ring
Содержание SYNAPT G2
Страница 18: ...xviii Table of Contents...
Страница 46: ...2 8 Starting Up and Shutting Down the Mass Spectrometer...
Страница 66: ...3 20 Configuring the LockSpray Source...
Страница 228: ...B 24 External Connections 7 Click Next Result The software installs 8 Click Finish...
Страница 232: ...C 4 Materials of construction and compliant solvents...