5
warmhaus.com.tr
CHAPTER-1
GENERAL CONDITIONS & INTRODUCTION
1.1. DELIVERING THE BOILER TO THE USER
After installing and commissioning the system, authorized service must deliver it to the user by following these procedures:
1. Inform the user to keep Installation and User Manual, to use the product according to the manual and his/her liabilities within the
framework of relevant national legislations.
2. Explain and show the appliance’s opening and closing procedures.
3. Operation of the boiler, using and adjusting the all controls of the system must be explained to the users completely to provide
possible maximum fuel saving in line with the user needs for both heating and hot water. In the event that system isn’t operating
under normal conditions, inform about the neccessary precautions not to damage the system or the building.
4. Explain heating the boiler, controlling and operating the domestic hot water.
5. Explain the user what to do in the cases of fault and error in the appliance.
6. To use the system economically, demonstrate and explain the boiler pumps with heating controls, circulation pumps, three way
valves, residue-air separator, DHW boiler, expansion tank, gas connections and pressure indicators and all functions of ventilation
systems and flue systems.
7. If there’s a timer, pay attention to the User Instructions and give them to the user.
8. Demonstrate and explain what to do in case of water pressure’s decreasing.
9. Explain the restart procedures of the appliance (see. INSTALLATION & USER MANUAL).
10.
DEFINITELY, fill the Commissioning Checklist (with signatures of vendor-costumer-service) and deliver it to the authorized
with Service Receipt after controlling installation’s conformity with the INSTALLATION & USER MANUAL. Send a copy of
Commissioning Checlist to Warmhaus Service Management with the Service Receipt.
IMPORTANT
Authorized Service Technician must check whether following operations are done correct:
a. Make sure that electrical connections are done correctly and earth cable has a good earthing system.
b. Conformity of the appliance’s Heating and Domestic Hot Water with gas line,
c. Conformity of the appliance’s parameter settings with the system and customer demands,
d. Make sure there is no liquid or flammable material near the boiler.
e. Open gas valve, control the all connections, durableness and impermeability of burner and exchanger.
f. Make sure that gas type of the boiler is suitable for it to function.
g. Check the impermeability of the flue pipe of exhaust gas, whether it is clogged and is installed properly.
h. Make sure that all valves of the system are open.
i. Make sure that heating system is filled with water and air is well discharged. -Check whether the circulation pump is jammed and
is functioning. Discharge the air in the heating system and gas line.
ANNUAL MAINTENANCE:
Emphasize the importance of having the annual maintenance of your appliance done by Warmhaus Authorized Service. Periodic
maintenance enables boiler economic service life and to function effectively.
BOILER MAINTENANCE CONTENT
These are the main issues which must be controlled periodically, and increase the service life and efficiency of your appliance and
system during condensing boiler maintenance.
•
General controls of the boiler(s) and the system,
•
Control of the condition of flammable burner and aluminum connecting flange -ionized -flame control electrode position-
•
Interior exterior cleaning control of the combustion chamber- exchanger
•
Control of the gas- combustion circuit connection and equipments of the boiler
•
Control of the drainage line of the condensation water
•
Control of the calibration settings of the gas valve
•
Control of the system pressure of central heating (radiator) circuit,
• Exchanger cleaning with system and boiler filters:
For effective and long time functioning, strainer, residue retainer cleaner,
water and smoke canals of main exchanger must always be clean.
• Pressure control of the water pressure and expansion tank of the boiler and system:
It is recommended for the boiler water
pressure to be 8,0 bar at minimum, for operation pressure to be between 1,5 -3 bar. Pressure control of expansion tanks in boiler
system, if low,filling with gas
• Control of the air purger:
Check if there is water in the cap of air purger. In case of leakage, change the purger.