![background image](http://html2.mh-extra.com/html/waltco-lift/bz-33/bz-33_installation-manual_3269133060.webp)
5. Insert the Rubber Seal & Air Foil down into Side Double Rails from the top as shown.
6.
Before
inserting the Rubber Seal and Air Foil into the Top Double Rail, drill holes in the Top
Double Rail and body header. Angled cuts on Top Double Rail and Side Double Rails should
make 90
°
corners as shown.
7. Insert Rubber Seal and Air Foil into Top Double Rail. Use Counter-Sunk Screws or Pop Rivets to
attach Top Double Rail to truck body as shown.
Air Foil
Rubber Seal
Fig. 4
Fig. 5
page 60
Содержание BZ-33
Страница 17: ...Chapter 4 Liftgate Installation Electric and Hydraulic Diagram G page 17...
Страница 18: ...Chapter 4 Liftgate Installation Electric and Hydraulic Diagram with Auto tilt G page 18...
Страница 61: ...Add silicone caulk to seal gaps between tracks and vehicle body page 61...
Страница 65: ...This page left intentionally blank page 65...