BATTERY KIT INSTALLATIONS
80101387
EO6410 Rev 04
7-22-10
INSTALLATION OF TERMINAL LUG
Strip 7/8” to 1” of insulation from end of cable.
Slide heat shrinkable tubing onto cable.
Insert bare wire into compression nut until it seats.
NOTE:
Be sure to use correct compression nut, use
2 gauge nut for 2 gauge cable, use 0
gauge nut for 0 gauge cable.
Note: Copper wire should be flush with, or slightly
past nut
GR00299
Grip nut with wrench and turn terminal until nut seats
GR00300
Position heat shrinkable tubing over terminal and end of
cable
Shrink tubing using electric heat gun or torch.
Note: To reduce chance of damaging tube and
cable, a heat gun is recommended
Apply sufficient heat to produce thin bead of sealant all
around tube edges
GR00301
Compression Nut
Heat shrinkable tubing
before installation
7/8” to 1”
Beads of Sealant
Heat Shrinkable
Tubing
page 54
Содержание BZ-33
Страница 17: ...Chapter 4 Liftgate Installation Electric and Hydraulic Diagram G page 17...
Страница 18: ...Chapter 4 Liftgate Installation Electric and Hydraulic Diagram with Auto tilt G page 18...
Страница 61: ...Add silicone caulk to seal gaps between tracks and vehicle body page 61...
Страница 65: ...This page left intentionally blank page 65...