8
•
Important Notes
Standards and Regulations for Operating the 750 Series
WAGO-I/O-SYSTEM
750
BACnet/IP Controller
1.2 Standards and Regulations for Operating the 750 Series
Please observe the standards and regulations that are relevant to your installa-
tion:
•
The data and power lines must be connected and installed in compliance
with the standards to avoid failures on your installation and eliminate any
danger to personnel.
•
For installation, startup, maintenance and repair, please observe the acci-
dent prevention regulations of your machine (e.g. BGV A 3, "Electrical In-
stallations and Equipment").
•
Emergency stop functions and equipment must not be made ineffective.
See relevant standards (e.g. DIN EN 418).
•
Your installation must be equipped in accordance to the EMC guidelines
so that electromagnetic interferences can be eliminated.
•
Operating 750 Series components in home applications without further
measures is only permitted if they meet the emission limits (emissions of
interference) according to EN 61000-6-3. You will find the relevant in-
formation in the section on "WAGO-I/O-SYSTEM 750"
!
"System De-
scription"
!
"Technical Data".
•
Please observe the safety measures against electrostatic discharge accord-
ing to DIN EN 61340-5-1/-3. When handling the modules, ensure that the
environment (persons, workplace and packing) is well grounded.
•
The relevant valid and applicable standards and guidelines concerning the
installation of switch cabinets are to be observed.
Содержание 750-830
Страница 359: ...Index 359 WAGO I O SYSTEM 750 BACnet IP Controller...