WAGO-I/O-SYSTEM 750
Table of Contents
5
750-8207 PFC200 CS 2ETH RS 3G
Manual
Draft version 1.2.1 from 2017-09-13, valid from FW Version 02.06.20(09)
Inserting the Controller ..................................................................... 77
Inserting the I/O Module ................................................................... 78
Connecting a Conductor to the CAGE CLAMP
................................... 79
Power Supply Concept ......................................................................... 80
Fuse Protection of the Electronic Circuit Power Supply .................... 80
Supplementary Power Supply Regulations ...................................... 81
Switching On the Controller .................................................................. 82
Determining the IP Address of the Host PC .......................................... 83
Setting an IP Address ........................................................................... 84
Assigning an IP Address using DHCP .............................................. 85
Changing an IP Address Using the “CBM” Configuration Tool via the
Changing an IP Address using “WAGO Ethernet Settings” .............. 89
Temporarily Setting a Fixed IP Address ........................................... 91
Testing the Network Connection ........................................................... 92
Changing Standard Passwords ............................................................ 93
Initiating Reset Functions ..................................................................... 95
Warm Start Reset ............................................................................ 95
CODESYS 2 Runtime System ..................................................... 95
Runtime System ...................................................... 95
Cold Start Reset ............................................................................... 95
CODESYS 2 Runtime System ..................................................... 95
Runtime System ...................................................... 95
Software Reset ................................................................................ 96
Configuration via Web-Based-Management (WBM) ......................... 98
WBM User Administration ............................................................ 99
General Information about the Page .......................................... 102
“Status Information” Page .......................................................... 105
“Controller Details” Group ..................................................... 105
“Network Details (Xn)” Group(s) ............................................ 105
“General PLC Runtime Configuration” Page .............................. 106
“General PLC Runtime Configuration” Group ........................ 106
“PLC Runtime Information” Page ............................................... 108
“PLC Runtime” Group ........................................................... 108
“Project Details” Group.......................................................... 108
“Task n” Group(s) .................................................................. 109
“PLC WebVisu” Page ................................................................ 110
“Web Server Configuration” Group ........................................ 110
“Configuration of Host and Domain Name” Page ....................... 111
“HostName” Group ................................................................ 111
“Domain Name” Group .......................................................... 111
“TCP/IP Configuration” Page ..................................................... 112
“IP Configuration (Xn)” Group(s) ........................................... 112
“Default Gateway n” Groups ................................................. 113