
TITANUS
SUPER·SENS
®
Pipe
Design
TSS_04_A-en-e
Data: 02/09
4 –
13
4.2.3 Sensitivity and pipeline project planning
4.2.3.1 Pipeline
project
planning with pipe accessories
The following project planning tables for pipeline project planning can be
found in the appendix for each previously selected pipe accessory.
z
Project planning without filter
z
Project planning with LF-AD air filter
z
Project planning with LF-AD-1 air filter
z
Project planning with LF-AD-2 air filter
z
Project planning with SF-400 / SF-650 air filter
An area can be monitored with more than detection points than re-
quired by the national guideline in order to improve an air sampling
smoke detection system’s detection quality. In such case, the number
of normatively required sampling points is to be used in calculating the
required sensitivity of an air sampling smoke detection system.
INSTRUCTION
Содержание TITANUS SUPER-SENS
Страница 2: ...www acornfiresecurity com www acornfiresecurity com ...
Страница 4: ...www acornfiresecurity com www acornfiresecurity com ...
Страница 10: ...TITANUS SUPER SENS Contents TSS_inhalt en e Data 02 09 www acornfiresecurity com www acornfiresecurity com ...
Страница 14: ...General TITANUS SUPER SENS 0 4 Data 02 09 TSS_00_A en e www acornfiresecurity com www acornfiresecurity com ...
Страница 126: ...Installation TITANUS SUPER SENS 5 34 Data 02 09 TSS_05_B en e www acornfiresecurity com www acornfiresecurity com ...
Страница 154: ...Commissioning TITANUS SUPER SENS 7 10 Data 02 09 TSS_07_A en e www acornfiresecurity com www acornfiresecurity com ...
Страница 164: ...www acornfiresecurity com www acornfiresecurity com ...
Страница 172: ...www acornfiresecurity com www acornfiresecurity com ...