Fig. 38
6.
Remove pump motor assembly from fryer.
A.
Remove pipe fittings from the pump, and
install on replacement pump and motor
assembly.
7.
Reverse procedure to install.
NOTE:
When installing, ensure the rubber vibration
pad or grommets are installed under the motor
mounting plate.
FRY TANK ASSEMBLY
Disconnect the
electrical power to the machine and
follow lockout / tagout procedures.
Shut off the gas
before servicing the unit and follow
lockout / tagout procedures.
All gas joints disturbed during
servicing must be checked for leaks. Check with a
soap and water solution (bubbles). Do not use an open
flame.
1.
Drain shortening from fryer tank.
2.
Disconnect the gas supply line to allow access to
fryer from all sides.
3.
Remove fryer baskets, crumb screen and basket
hanger.
NOTE:
If the fryer is equipped with automatic basket
lifts, remove lift arms from the support rods before fry
tank removal.
NOTE:
If the fryer is a battery section, remove grease
strip, and split the silicone seal between the fryer
section tanks with utility knife.
4.
On battery fryer sections only, remove bolts
securing the drain pipe flange to the manual drain
valve.
Fig. 39
5.
Disconnect temperature probe and drain valve
interlock switch (DVI) connector (6-pin).
Fig. 40
6.
Remove power supply box as outlined under
POWER SUPPLY BOX.
7.
On battery fryer sections only, remove bottom
cover from base frame.
Fig. 41