CAUTION
If orifice is clogged with debris, clean with
air or liquid only.
Fig. 20
5.
Reverse procedure to install, and then check for
proper operation.
TEMPERATURE PROBE
Disconnect the
electrical power to the machine and
follow lockout / tagout procedures.
Shut off the gas
before servicing the unit and follow
lockout / tagout procedures.
CAUTION
Do not sharply bend and kink the
temperature probe, or damage may occur.
1.
Drain shortening from fryer tank.
2.
Disconnect temperature probe and drain valve
interlock (DVI) connector.
Fig. 21
NOTE:
The connector has six pin positions, and is
labeled G on the wiring diagram.
3.
Remove the temperature probe lead wires from
the 6-pin female connector.
Pin No.
Description
G-1
Probe
G-2
Empty
G-3
Probe
G-4
Empty
G-5
DVI Switch (24VAC) N.O.
IN
G-6
DVI Switch (24VAC)
OUT
4.
Remove the burners as outlined under GAS
BURNERS.
5.
Remove the probe retaining and packing nuts.
Fig. 22
GR Series Gas Fryers with NCC Controls (formerly Tridelta / Built after 3/05) - REMOVAL AND REPLACEMENT
OF PARTS
Page 15 of
56
F35660
Rev. A (0717)