4.
From underneath the fryer:
A.
Disconnect the discard valve switch lead
wire connector from power supply box.
B.
Remove switch mounting screws.
Fig. 12
5.
Reverse procedure to install and check for proper
operation.
GAS BURNERS
Disconnect the
electrical power to the machine and
follow lockout / tagout procedures.
Shut off the gas
before servicing the unit and follow
lockout / tagout procedures.
1.
Open the door to the fryer section being serviced.
2.
Remove gas burner shipping ties (if installed).
Fig. 13
3.
On battery fryer sections only, remove drain pipe.
Fig. 14
NOTE:
On fryers with gas valve arm extension,
remove cotter pin securing handle to gas valve on/off
knob adaptor, and remove extension arm bracket (as
necessary) for right side burner removal clearance.
4.
Lift gas burner up, and tilt the top of burner toward
fryer until it clears the gas orifice at the bottom.
NOTE:
The burners mount to the fryer's burner
mounting bracket by shoulder bolts that rest in the
keyway slot.
GR Series Gas Fryers with NCC Controls (formerly Tridelta / Built after 3/05) - REMOVAL AND REPLACEMENT
OF PARTS
F35660
Rev. A (0717)
Page 12 of
56