Rotary lobe pump
Operating instructions
VX100Q, VX136Q..QD..QDM2, VX186Q..QD..QDM2, VX230Q..QD
36/68
VX136/VX186:
Upright installation
Horizontal installation
VX230:
Upright installation
Fig.
22
: Gear oil change VX136, VX186, VX230
1
Hexagon head screw plug
A
fill
2
magnetic hexagon head screw plug
B
drain
3
Grease nipple (at gearbox side)
B*
alternatively empty via
B1
4
Grease nipple (at the VX186QD cover)
C
check
•
The hexagon head screw plug
1
must always be on top of the pump, the magnetic hexagon head
screw plug
2
on the bottom of the pump.
•
Tightening torque for mounting the hexagon head screw plugs
60 Nm
Содержание VX Series
Страница 1: ...Best Practices for Installation of VX Rotary Lobe Pumps WELCOME TO VOGELSANG FACTORY TRAINING ...
Страница 6: ...Follow all best practices for safety when working on Vogelsang Equipment Preparing for Installation ...
Страница 15: ...Installation ...
Страница 24: ...Pressurizing the Pump ...
Страница 36: ...Direction of flow Startup Checklist Startup ...
Страница 44: ......
Страница 121: ...Service Manual Service Manual Pump Models VX Series Q Pumps ...
Страница 122: ...Service Manual Service Manual Pump Models VX Series Q Pumps ...
Страница 123: ...Service Manual Service Manual Pump Models VX Series Q Pumps ...
Страница 133: ...Service Manual Service Manual Pump Models VX Series Q Pumps Operational Startup Testing continued ...
Страница 189: ...Service Manual Service Manual Pump Models VX Series Q Pumps Warranties 4 A 1 Warranty Information ...
Страница 191: ...Service Manual Service Manual Pump Models VX Series Q Pumps 5 A 1 Documents for Testing at Initial Startup continued ...
Страница 192: ...Service Manual Service Manual Pump Models VX Series Q Pumps 5 A 1 Documents for Testing at Initial Startup continued ...