Service Manual
Service Manual
Pump Models:
Series Q Pumps
Preventative Maintenance
Inspection & Routine Adjustment
S
tocke
d P
u
m
p
s:
Onc
e
E
v
e
ry 3
0
day
s
Initial Startup
Before & After long
out-of-se
rvi
c
e
period
s
10 ope
rating
hours
after initial startup
20 ope
rating
hours
after initial startup
Every 20
0 op
erating
hours
Every 50
0 op
erating
hours o
r 3 months
Every 20
00 o
peratin
g
hours
After Ex
pos
u
re to s
trong
contami
natio
n
New Pump w/Mechanical
Seal combination of metals:
SiC-Si/TC. One Rotation
when not in service
X
Remove plastic plug from
breather on V100 QHD
Pumps.
X
Check belt tension for
belt drive pumps according
to specification for all
pumps configured with
V-Belt Drives
X
X
Tighten all mounting bolts
X
Check buffer chamber oil
level
X X
Change buffer chamber oil
X X
Change Gear Oil
X
X
Check Gear Oil Level
X
Содержание VX Series
Страница 1: ...Best Practices for Installation of VX Rotary Lobe Pumps WELCOME TO VOGELSANG FACTORY TRAINING ...
Страница 6: ...Follow all best practices for safety when working on Vogelsang Equipment Preparing for Installation ...
Страница 15: ...Installation ...
Страница 24: ...Pressurizing the Pump ...
Страница 36: ...Direction of flow Startup Checklist Startup ...
Страница 44: ......
Страница 121: ...Service Manual Service Manual Pump Models VX Series Q Pumps ...
Страница 122: ...Service Manual Service Manual Pump Models VX Series Q Pumps ...
Страница 123: ...Service Manual Service Manual Pump Models VX Series Q Pumps ...
Страница 133: ...Service Manual Service Manual Pump Models VX Series Q Pumps Operational Startup Testing continued ...
Страница 189: ...Service Manual Service Manual Pump Models VX Series Q Pumps Warranties 4 A 1 Warranty Information ...
Страница 191: ...Service Manual Service Manual Pump Models VX Series Q Pumps 5 A 1 Documents for Testing at Initial Startup continued ...
Страница 192: ...Service Manual Service Manual Pump Models VX Series Q Pumps 5 A 1 Documents for Testing at Initial Startup continued ...