1. Flush pump with clean water (or water glycol mix), empty and allow it to dry.
2. Lightly grease bare metal surfaces and shafts.
3. Store the pump assembly in horizontal position in a dry area.
4. Temperature must not go below 23
°
F and the relative humidity not less than 60%.
5. No direct exposure to sunlight or UV light.
6. No aggressive, corrosive substances (contaminated air, ozone, gases, solvents,
acids, alkalis, salts, radioactivity etc.) in the immediate vicinity.
7. No constant vibration or oscillation.
Vogelsang Service Webinar |
Storage
Short Term Storage
Содержание VX Series
Страница 1: ...Best Practices for Installation of VX Rotary Lobe Pumps WELCOME TO VOGELSANG FACTORY TRAINING ...
Страница 6: ...Follow all best practices for safety when working on Vogelsang Equipment Preparing for Installation ...
Страница 15: ...Installation ...
Страница 24: ...Pressurizing the Pump ...
Страница 36: ...Direction of flow Startup Checklist Startup ...
Страница 44: ......
Страница 121: ...Service Manual Service Manual Pump Models VX Series Q Pumps ...
Страница 122: ...Service Manual Service Manual Pump Models VX Series Q Pumps ...
Страница 123: ...Service Manual Service Manual Pump Models VX Series Q Pumps ...
Страница 133: ...Service Manual Service Manual Pump Models VX Series Q Pumps Operational Startup Testing continued ...
Страница 189: ...Service Manual Service Manual Pump Models VX Series Q Pumps Warranties 4 A 1 Warranty Information ...
Страница 191: ...Service Manual Service Manual Pump Models VX Series Q Pumps 5 A 1 Documents for Testing at Initial Startup continued ...
Страница 192: ...Service Manual Service Manual Pump Models VX Series Q Pumps 5 A 1 Documents for Testing at Initial Startup continued ...