![Vogelsang VX Series Скачать руководство пользователя страница 68](http://html.mh-extra.com/html/vogelsang/vx-series/vx-series_manual_1044344068.webp)
Rotary lobe pump
Operating instructions
VX100Q, VX136Q..QD..QDM2, VX186Q..QD..QDM2, VX230Q..QD
24/68
6
Start-up
Personnel for start-up and operation
We recommend starting up the machine in the presence of persons who are responsible for further operation
of the machine.
6.1
Check list before start-up
Are the inlet and outlet lines connected?
Is the coupling, if present, correctly aligned?
Are the cardan shafts, if present, correctly aligned?
Is the belt tension OK?
Are the optional buffer chamber assemblies correctly installed? Are they correctly adjusted?
Is the buffer chamber pressure OK?
Are the oil grade and oil level in the gearbox of the pump OK?
Is the type of buffer or quenching fluid OK? Is the fluid level in the buffer chamber OK?
If equipped with a grease nipple, has the sealing prechamber been greased?
Have all safety devices been installed and their proper functioning ensured?
Is the motor connected correctly to the power supply (see documents provided by the motor
manufacturer)?
Star or delta connection, voltage, frequency (see name plate and inside of terminal box)?
Motor protection ensured, e.g., by a circuit breaker?
A short switching time should be set for star-delta starting (if present).
A short start ramp should be set for the soft starter, if present.
Is the variable frequency drive/soft starter, if present, designed and configured correctly?
Units should be suitable for heavy starting
Is the motor hydraulically correctly connected?
Are safety devices or maintenance switches easy to reach?
Is the flow direction OK? Check the pump's direction of rotation.
Is the pipe system sealed and free of leakage?
Is free flow within the pipe system ensured?
Positive displacement pumps may never pump medium into a sealed pipe.
Are the drain cocks closed, and is the pump filled with fluid?
Put the pump into operation and check inlet and outlet pressure, speed and capacity.
Содержание VX Series
Страница 1: ...Best Practices for Installation of VX Rotary Lobe Pumps WELCOME TO VOGELSANG FACTORY TRAINING ...
Страница 6: ...Follow all best practices for safety when working on Vogelsang Equipment Preparing for Installation ...
Страница 15: ...Installation ...
Страница 24: ...Pressurizing the Pump ...
Страница 36: ...Direction of flow Startup Checklist Startup ...
Страница 44: ......
Страница 121: ...Service Manual Service Manual Pump Models VX Series Q Pumps ...
Страница 122: ...Service Manual Service Manual Pump Models VX Series Q Pumps ...
Страница 123: ...Service Manual Service Manual Pump Models VX Series Q Pumps ...
Страница 133: ...Service Manual Service Manual Pump Models VX Series Q Pumps Operational Startup Testing continued ...
Страница 189: ...Service Manual Service Manual Pump Models VX Series Q Pumps Warranties 4 A 1 Warranty Information ...
Страница 191: ...Service Manual Service Manual Pump Models VX Series Q Pumps 5 A 1 Documents for Testing at Initial Startup continued ...
Страница 192: ...Service Manual Service Manual Pump Models VX Series Q Pumps 5 A 1 Documents for Testing at Initial Startup continued ...