![Vogelsang VX Series Скачать руководство пользователя страница 162](http://html.mh-extra.com/html/vogelsang/vx-series/vx-series_manual_1044344162.webp)
Service Manual
Service Manual
Pump Models:
VX Series Q Pumps
Adding Lubricants
Double-check that all drain plugs
are installed in the bottom of the
pump.
Remove the side bolt from the
pumps gear box. From the top, fill
the gearbox with oil until begins
to run out of the side hole, which
translates to filling the gearbox up
about halfway. Replace the side
drain plug and tighten (
Fig 43
).
Fill the blocking chamber
completely to the top with oil
(
Fig 44
).
Note:
Refer back to the
instructions regarding the use of
the Pressurized Oil Bottle. The
appropriate pressure must be set
to your particular pump to help
ensure maximum mechanical
seal liftetime.
Fig. 43
Fig. 44
Содержание VX Series
Страница 1: ...Best Practices for Installation of VX Rotary Lobe Pumps WELCOME TO VOGELSANG FACTORY TRAINING ...
Страница 6: ...Follow all best practices for safety when working on Vogelsang Equipment Preparing for Installation ...
Страница 15: ...Installation ...
Страница 24: ...Pressurizing the Pump ...
Страница 36: ...Direction of flow Startup Checklist Startup ...
Страница 44: ......
Страница 121: ...Service Manual Service Manual Pump Models VX Series Q Pumps ...
Страница 122: ...Service Manual Service Manual Pump Models VX Series Q Pumps ...
Страница 123: ...Service Manual Service Manual Pump Models VX Series Q Pumps ...
Страница 133: ...Service Manual Service Manual Pump Models VX Series Q Pumps Operational Startup Testing continued ...
Страница 189: ...Service Manual Service Manual Pump Models VX Series Q Pumps Warranties 4 A 1 Warranty Information ...
Страница 191: ...Service Manual Service Manual Pump Models VX Series Q Pumps 5 A 1 Documents for Testing at Initial Startup continued ...
Страница 192: ...Service Manual Service Manual Pump Models VX Series Q Pumps 5 A 1 Documents for Testing at Initial Startup continued ...