VITEK 5-in-1 CCTV TESTING MONITOR
Page 47
Note:
1. Do not input power into the “DC12/3A OUTPUT” port.
2. Do not connect the DC12V/3A power to the DC12V/IN port of the IP camera tester to avoid
damage.
3. The IPC tester power output is close to 3A. If the IP camera’s power is over 3A, the tester will auto
enter protection mode. Disconnect all the connections of the tester and then connect the tester with
power adaptor to resume the tester.
4. Before turning on the PoE power output, please make sure the IP camera supports PoE power.
Otherwise it may damage the IP camera.
5 Make sure you plug in your IP camera to the LAN port prior to turning on PoE power.
6.
Make sure the tester is fully charged or more than 80% charged, otherwise the tester will show
“low power”, “not able to supply power”.
3.3.13 RJ45 cable TDR test
Connect cable to tester’s LAN port, click icon “ ” to enter RJ45 cable TDR test
app.
Single test:
Test cable status, length and attenuation.
Repeat test:
Continue to test cable status, length and attenuation.