Chapter 3 Project engineering
Manual VIPA System 200V
3-18
HB97E - CP - Rev. 11/30
Here you may see if an order has already been started, if an error occurred
or if this order is blocked, e.g. a virtual connection doesn’t exist any longer.
Bit 1: Order running
Set:
Per plug-in: when the CP received the order.
Delete:
Per plug-in: when an order has been commissioned (e.g.
receipt received).
Analyze:
Per handling blocks: A new order is only send, when the
order before is completely commissioned.
Per user: when you want to know, if triggering a new
order is convenient.
Bit 2: Order ready without errors
Set:
Per plug-in: when the according order has been
commissioned without errors.
Delete:
Per plug-in: when the according order is triggered for a
second time.
Analyze:
Per user: to proof that the order has been commissioned
without errors.
Bit 3: Order ready with errors
Set:
Per plug-in: when the according order has been
commissioned with errors. The cause of the error may be
found in byte 0 of the indicator word.
Delete:
Per plug-in: when the according order is triggered for a
second time.
Analyze:
Per user: to proof that the order has been commissioned
with errors. If set, the error code may be found in byte 0
of the indicator word.
Status management
CPU Byte 1
Содержание CP 240 RS232
Страница 1: ...Manual VIPA System 200V CP Order No VIPA HB97E_CP Rev 11 30...
Страница 2: ...L...
Страница 14: ...Chapter 1 Basics Manual VIPA System 200V 1 6 HB97E CP Rev 11 30...
Страница 126: ...Chapter 5 CP 240 EnOcean Manual VIPA System 200V 5 32 HB97E CP Rev 11 30...
Страница 144: ...Chapter 6 CP 240 M Bus Manual VIPA System 200V 6 18 HB97E CP Rev 11 30...
Страница 148: ...Index Manual VIPA System 200V A 4 HB97E CP Rev 11 30 M Stich...