14
www.vintageair.com
905168 REV G 4/13/15, PG 14 OF 17
1. Turn on the ignition switch (Do not start the engine).
2. Move the control levers/knobs to the position
shown.
3. Connect the white jumper wire to the gray program
wire. Wait for the blower speed to change (Approximately
5 seconds).
4. Move the control levers/knobs to the positions
shown.
5. Disconnect the white jumper wire from the gray
program wire. The blower speed will change,
indicating completion of the calibration procedure.
6. Confirm proper operation of controls. Repeat
procedure if necessary. When finished, tape
over program wire connector with electrical tape to
prevent accidental contact with chassis ground.
Control Panel
Calibration Procedure (Cont.)
DASH
HOT
HI
DASH
HOT
HI
OFF
ON
START
Содержание 1967-68 CAMARO w/o Factory Air Gen IV
Страница 17: ......