Checking the ionisation current
A
Adaptor cable (available as
accessory)
1.
Connect the test equipment
according to the diagram.
2.
Adjusting the upper output:
Constant temperature control
unit:
K
+
d
press simultaneously:
"
1
" is shown.
a
press:
"
2
" is shown.
Weather-compensated control
unit:
K
+
d
press simultaneously:
"
Relay test
" and then
"
Base load
" is shown.
a
press:
"
Full load
" is shown.
3.
Ionisation current when the flame is
first established: min. 4 µA
Steps in case the ionisation current
is < 4 µA:
&
Check the electrode gap
&
Check the control unit power sup-
ply.
4.
Press
d
.
Operation with the upper output is
terminated.
5.
Record the actual value in the ser-
vice report.
Further details regarding the individual steps
(cont.)
40
Commissioning, inspection, maintenance
5592
817
GB
Содержание VITOPEND 200
Страница 9: ...Installing the boiler and making all connections 9 Installation sequence 5592 817 GB Installation...
Страница 12: ...Opening the control unit casing 12 Installation sequence 5592 817 GB...
Страница 16: ...Fitting the programming unit into the control unit 16 Installation sequence 5592 817 GB...
Страница 17: ...Fitting the front panel 17 Installation sequence 5592 817 GB Installation...
Страница 113: ...Connection and wiring diagram internal connections 113 Designs 5592 817 GB Service...
Страница 119: ...Parts lists cont 119 Parts lists 5592 817 GB Service...
Страница 120: ...Parts lists cont 120 Parts lists 5592 817 GB...
Страница 121: ...Parts lists cont 121 Parts lists 5592 817 GB Service...
Страница 122: ...Parts lists cont 122 Parts lists 5592 817 GB...
Страница 130: ...130 5592 817 GB...
Страница 131: ...131 5592 817 GB...