
23
Note
Refit in reverse order.
Checking the condensate drain and cleaning the siphon (if instal-
led)
1.
Check at siphon (see page 9), that
the condensate can freely drain off.
2.
Clean the siphon.
3.
Fill the siphon with water.
Checking the neutralising system (accessories)
Subject to a neutralising system being housed in the boiler plinth:
■ Remove the front cover from the plinth.
■ Extract the neutralising system from the plinth.
■ When installing the neutralising system ensure that the hoses are not kinked, and
that no backup loops are created.
Check the function of the neutralising
system:
Check the pH value of the condensate
with pH test strips.
Replace the granulate if the pH value
< 6.5.
Note
Part no. for pH test strips: 9517 678.
Please observe the instructions of the
manufacturer of the neutralising sys-
tem.
Checking the active charcoal filter (accessories)
Note
Please observe the instructions of the manufacturer of the active charcoal filter sup-
plied.
Adjusting the standard burner settings
Note
To be able to adjust the burner, there
must be a heat demand and heat trans-
fer must also be assured.
Commissioning, inspection, maintenance
Further details regarding the individual steps
(cont.)
5692 774 GB
Содержание Vitoladens 300-C
Страница 88: ...88 Internal extensions H1 PCB A5 and H3 PCB A9 Designs Connection and wiring diagram internal cont 5692 774 GB ...
Страница 92: ...92 206 217 221 205 202 203 204 221 201 214 208 216 215 200 214 Parts lists Parts lists cont 5692 774 GB ...
Страница 95: ...95 308 312 311 310 313 309 306 307 305 309 314 304 Parts lists Parts lists cont 5692 774 GB ...
Страница 96: ...96 100 102 108 111 112 103 109 106 101 Parts lists Parts lists cont 5692 774 GB ...
Страница 103: ...103 5692 774 GB ...