A
Heating command
B
Primary pump
C
Secondary pump
D
Compressor
E
Start delay
F
Secondary pump flow
G
Primary pump flow
H
OFF
K
ON
Access
&
"
System settings
"
&
"
Program
"
&
"
Heat pump
"
&
"Flow primary pump"
or
"
Flow secondary pump
" (
P
/
Q
)
Standard setting
2:00 min
Setting range
00:10 to 16:40
min
Optimum runtime
Setting the optimum heat pump run-
time. Excessive runtimes (subject to
the primary circuit layout) can lead to
the ground probe icing up, which
reduces the efficiency.
Flow, primary/secondary pump
(cont.)
87
Heat pump control settings
55
92
901
GB
Service
Содержание VITOCAL 300
Страница 19: ...Connection diagram Open CLOSE System version 1 cont 19 Preparing for installation 5592 901 GB...
Страница 22: ...Connection diagram Open CLOSE System version 2 cont 22 Preparing for installation 5592 901 GB...
Страница 66: ...Main menu Information A See page 67 Menu structure overview Information 66 Control unit settings 5592 901 GB...
Страница 137: ...Control PCB 137 Connection and wiring diagrams 5592 901 GB Service...
Страница 140: ...Parts lists cont 140 Parts lists 5592 901 GB...
Страница 141: ...Parts lists cont 141 Parts lists 5592 901 GB Service...
Страница 159: ...159 5592 901 GB...