Preparing for installation
Positioning .................................................................................................
9
Overview of possible system versions .........................................................
9
Function description for the individual system versions................................
11
System design on the primary side ..............................................................
14
System version 1 ........................................................................................
18
System version 2 ........................................................................................
21
System version 3 ........................................................................................
24
Additions to the system versions .................................................................
28
Installation sequence
Overview of electrical connections ..............................................................
32
Room temperature sensor (part no. 9532 653).............................................
32
Three-way diverter valve, heating/DHW ......................................................
33
Central fault message .................................................................................
35
Primary pump (only for type WWC) .............................................................
35
Information regarding the hydraulic connection ...........................................
36
Connection on the primary side ...................................................................
38
Connections on the heating circuit side .......................................................
39
Power supply ..............................................................................................
39
Service instructions
Commissioning, inspection, maintenance
Steps - commissioning, inspection and maintenance ...................................
41
Further details regarding the individual steps ..............................................
43
Troubleshooting
Control unit diagnostics ..............................................................................
57
Diagnosis ...................................................................................................
64
Control unit settings
Menu structure overview
–
Main menu ........................................................
65
Menu structure overview
–
Information ........................................................
66
Menu structure overview
–
Programming.....................................................
68
Menu structure overview
–
Technical service level.......................................
71
Control settings made by contractors ..........................................................
76
Enabling the technical service level.............................................................
76
Adjusting sensor temperatures....................................................................
77
Checking signal inputs ................................................................................
78
Controlling the relays and mixers manually .................................................
78
System definition control settings
System design ............................................................................................
80
Index
4
Index
55
92
901
GB
Содержание VITOCAL 300
Страница 19: ...Connection diagram Open CLOSE System version 1 cont 19 Preparing for installation 5592 901 GB...
Страница 22: ...Connection diagram Open CLOSE System version 2 cont 22 Preparing for installation 5592 901 GB...
Страница 66: ...Main menu Information A See page 67 Menu structure overview Information 66 Control unit settings 5592 901 GB...
Страница 137: ...Control PCB 137 Connection and wiring diagrams 5592 901 GB Service...
Страница 140: ...Parts lists cont 140 Parts lists 5592 901 GB...
Страница 141: ...Parts lists cont 141 Parts lists 5592 901 GB Service...
Страница 159: ...159 5592 901 GB...