Vertiv | Liebert CRV CCD10 Condenser | User Manual
Prior to connecting any equipment to a main or alternate power source (for example: back-up generator
systems) for start-up, commissioning, testing, or normal operation, ensure that these sources are correctly
adjusted to the nameplate voltage and frequency of all equipment to connected. In general, power-source
voltages should be stabilized and regulated to within ±10% of the load nameplate nominal voltage. Also,
ensure that no three-phase sources are single-phased at any time.
NOTICE!
Risk of control malfunction. Can cause improper unit operation.
Verify that all low-voltage electrical wiring has been performed per the schematic diagram provided and that
all low-voltage wiring connections are tight.
NOTICE!
Risk of improper lifting. Can cause equipment damage. Make sure that the spreader bars are wider than the
unit. If the spreader bars are too short, the slings may crush the unit.
NOTICE!
Risk of doorway/hallway interference. Can cause unit and/or structure damage. The unit may be too large to
fit through a doorway or hallway while on the skid. Measure the unit and passageway dimensions
,
and refer
to the installation plans prior to moving the unit to verify clearances.
NOTICE!
Risk of improper storage. Keep the unit upright, indoors and protected from dampness, freezing temperatures
and contact damage.