To turn on the appliance
1
Verify that all connected storage shelves function correctly. Use the LED
information in the procedure that explains how to turn on the storage shelves.
2
On the front, right, side of the appliance press the Power button.
3
Verify that the bottom LED in all 12 disk drive slots are green.
The following table provides details of the appliance disk drive LEDs.
Description
States
LED
No disk fault
Disk fault
A RAID rebuild is in progress
Off
Solid amber
Blinking amber
1-Status LED,
Top
Power is on and the disk has
spun down
Power is on but there is no disk
activity
Power is on and the disk is
spinning up
Commands are processing
Off
Solid green
Blinking green
Blinks green occasionally
2-Activity LED,
Bottom
64
Installation procedures
Turning on the hardware and verifying operation
Содержание 5250
Страница 1: ...Veritas 5250 Appliance Hardware Installation Guide ...
Страница 46: ...46 Installation procedures Connecting an appliance to more than one storage shelf ...
Страница 47: ...47 Installation procedures Connecting an appliance to more than one storage shelf ...
Страница 53: ...53 Installation procedures Connecting an appliance to more than one storage shelf ...
Страница 151: ...V Veritas Remote Management interface accessing 70 151 Index ...