2
Connect each storage shelf top canister port B to next storage shelf top canister
port A. Ensure that the blue tab is on the same side of the SAS-3 cable as the
SAS-3 label when the cable is connected.
Follow the diagrams until all storage shelf top canisters are connected.
45
Installation procedures
Connecting an appliance to more than one storage shelf
Содержание 5250
Страница 1: ...Veritas 5250 Appliance Hardware Installation Guide ...
Страница 46: ...46 Installation procedures Connecting an appliance to more than one storage shelf ...
Страница 47: ...47 Installation procedures Connecting an appliance to more than one storage shelf ...
Страница 53: ...53 Installation procedures Connecting an appliance to more than one storage shelf ...
Страница 151: ...V Veritas Remote Management interface accessing 70 151 Index ...