3
Connect the two new SAS-3 cables that ship with each storage shelf, as shown.
4
Connect power cords between the new storage shelf and separate Power
Distribution Units (PCUs) in the rack.
5
Turn on the new storage shelf. Let the shelf initialize for a few minutes.
6
Verify that the new shelf functions correctly.
Refer to the following section for details.
See
“Turning on the hardware and verifying operation”
on page 56.
145
Adding storage shelves to an operating appliance that has at least one storage shelf attached
Recabling to connect additional shelves
Содержание 5250
Страница 1: ...Veritas 5250 Appliance Hardware Installation Guide ...
Страница 46: ...46 Installation procedures Connecting an appliance to more than one storage shelf ...
Страница 47: ...47 Installation procedures Connecting an appliance to more than one storage shelf ...
Страница 53: ...53 Installation procedures Connecting an appliance to more than one storage shelf ...
Страница 151: ...V Veritas Remote Management interface accessing 70 151 Index ...